Supplier Quote Scope Comparator

Compare whether two quotations define the same project boundary. “Included” means clearly itemized in writing; “Unclear” should be resolved before a price comparison.

Scope item Quote A Quote B
Equipment modules and battery limits
Product and throughput design basis
Freezer and refrigeration responsibility
Mechanical and conveyor interfaces
Electrical and control interfaces
Factory layout and utility schedule
Factory test conditions
Site installation and commissioning
Training and document package
Acceptance criteria and punch-list closure

Quote A completeness

0/10

Quote B completeness

0/10

Comparison result

Pending calculation.