We configure and integrate pet food processing equipment across four routes: dry kibble extrusion, freeze-dried treats, wet canning and jerky drying. Tell us the product format and the output you’re planning for, and we come back with a line configuration rather than a machine list. Control capability is part of the build, not an afterthought bolted on at commissioning.

  • Four production routes
  • Configuration and quotation in one business day
  • Line integration from equipment through to the control layer

Production routes

Dry kibble extrusion, freeze-dried treats, wet canning, jerky drying

Wet line batch window

80–900 kg/Batch

Sterilising equipment

Four retort sizes, built in house

Hardware we make ourselves

Custom retorts and smart packaging equipment

Machines arrive smart

Built on the STUnit platform, so control capability ships with the equipment

Software after handover

Standalone OTA upgrades, without touching the mechanics

Quotation turnaround

Configuration and quotation returned in one business day

Your recipe and output data are used only to configure the line and price the project. If you want to test your own readiness first, our Dry Kibble Scope Readiness Score runs in your browser with nothing to fill in.

Pet Food Processing Capabilities Across Four Production Routes

Pet food processing covers every step between a raw material intake and a sealed pack: dosing, size reduction, thermal treatment, drying or sterilising, inspection and packing. Which of those steps you need depends entirely on the product format, not on the category: dog food and cat food in the same format share a line far more comfortably than two formats for the same animal. Shandong Shengtu Bufan Intelligent Technology Co., Ltd. builds around four published routes, and a project usually starts by choosing one of them.

Dry kibble extrusion line equipment

Dry kibble extrusion line

The dry kibble route, the dry pet food line most brands start with, runs batching and dosing, grinding, mixing and conditioning, twin-screw extrusion, shaping and cutting, multi-layer drying, coating or seasoning, conveying and packaging.

  • Eight process stages, published on the route page
  • Mixer, hammer mill, extruder and dryer configured as one line
  • The extrusion process builds texture through shear and a heated barrel jacket, and the die and cutting system decide the different shapes you can sell
  • Single- and twin-screw extruders suit different fat and moisture ranges, so the recipe decides which one goes in, a twin-screw machine will extrude a higher-fat dough that a single-screw machine won't
  • Coating applied after drying, before the packaging handoff
  • If the extruder is the only machine you're replacing, it's also sold on its own; see the twin-screw food extruder
Freeze-dried pet treat line machinery

Freeze-dried pet treat line

The freeze-dried route makes pet treats and raw toppers through material preparation, vacuum freeze-drying, metal detection and a packaging handoff. It's the shortest of the four routes and the most sensitive to load planning, because the dryer cycle sets the rhythm of everything upstream.

  • Four process stages
  • Bubble washing and dicing ahead of the freeze dryer
  • Metal detection before the bag is made and filled
Wet pet food canning line and sterilizers

Wet pet food canning line

The wet canning route runs dicing, filling, seaming, retort sterilizing, air drying, labeling. This is the route where the equipment has to prove what it did, because a sealed low-acid pack is only safe if the thermal process behind it's documented.

  • Six process stages, ending at the labeller
  • Batch window of 80–900 kg/Batch
  • Four retort sizes to match batch size to demand
  • The vessel is also a product in its own right; see retort and autoclave sterilisers supplied as standalone units for vessel formats and batch sizing
Pet jerky drying line equipment

Pet jerky drying line

The jerky route runs strip cutting, marinating, drying, metal detection, premade-bag packing. Marinating is the stage that most often gets under-sized, because it's the only step whose duration is set by the recipe rather than by the machine.

  • Five process stages
  • Strip cutting sized to the finished chew geometry
  • Premade-bag packing at the end of the line

Why a human-food rule governs one of these four routes

Part 113, the federal canning rule the wet route answers to, was written for food for people. It reaches a pet line through a separate provision: 21 CFR 500.23 applies Parts 507 and 113 to low-acid foods in hermetically sealed containers intended for use as food for animals, subject to the exemptions in 507.5(b). That one sentence of law is why retort sizing and batch records are design inputs on the wet canning route and not on the other three.

What we build and what we integrate

  • Custom retorts and smart packaging equipment are designed and made by us
  • Extrusion, grinding and freeze-drying machines are specified and integrated into the line
  • Line integration and smart factory planning is the scope we take responsibility for end to end
  • Self-produced hardware is what makes the deep integration possible, because the control layer and the machine are designed together
Shengtu is a high-tech enterprise in Weifang working in food machinery R&D, manufacturing, and whole-plant digital solutions. That mix is the reason a project can start as a single machine and grow into a plant without a change of supplier.

The stages after the defining process are where most of a line's cost and most of its failure modes live. Below, each stage is named with what it decides and whether the equipment is ours or specified into the line.

StageWhat it decidesPosition in the lineIn-house or integrated
Multi-layer dryingFinished moisture and, more importantly, the spread of moisture across the bedAfter extrusionIntegrated
Coating and seasoningFat and palatant pickup, and the surface the pack has to holdAfter dryingIntegrated
Vacuum coolingPack temperature before sealing, which drives condensation riskBefore packingIntegrated
Retort sterilizingCommercial sterility of a sealed low-acid packAfter seamingIn house
Air dryingSurface water on cans before the labellerAfter the retortIntegrated
Vacuum freeze-dryingStructure retention and cycle lengthCore of the freeze-dried routeIntegrated
Moisture equalisationHow wide the finished moisture band actually isAfter dryingIntegrated
Metal detectionPhysical hazard control before the pack is closedBefore packingIntegrated
Weighing and dosingGiveaway per pack and fill accuracyAt the packerIntegrated
Premade-bag and vacuum packingBarrier, seal integrity and pack formatEnd of lineIn house
LabellingPack identity and code legibilityEnd of lineIntegrated

One stage on that list is not a preference

Retort sterilizing is the only stage above whose performance is set in regulation rather than by choice. For a sealed low-acid pack sold into the United States, 21 CFR Part 113 defines the equipment and the records that stage has to produce, which is why it's specified before the layout is drawn.

Custom retorts and smart packaging equipment are the two families we manufacture ourselves, and they're marked as such above. Everything else on the line is specified, integrated and commissioned by us.

Below is the configuration matrix we work from. It sets out what's fixed by the route, what's chosen at configuration stage, and what has to be decided by your market rather than by the equipment.

Configuration itemWhat we configure
Dry kibble route8 published process stages, from batching and dosing through twin-screw extrusion to conveying and packaging
Wet canning route6 published process stages, ending in retort sterilizing, air drying and labeling
Freeze-dried route4 published process stages built around vacuum freeze-drying
Jerky route5 published process stages, from strip cutting and marinating through drying and metal detection
Wet line batch window80–900 kg/Batch
Retort selectionFour retort sizes, so batch size follows demand instead of the other way round
Sterilising instrumentation for United States shipmentsA temperature-indicating device accurate to 1 °F (0.5 °C) and a separate temperature-recording device writing to a permanent record, as 21 CFR 113.40 requires
Per-batch record setInitial temperature, actual processing time and both device readings against the container size and code, as set out in 21 CFR 113.100
Dryer and coater sizing rule we applySized against the extruder rating rather than matched 1:1, so the dryer is not the ceiling on the line
Control layerLow-code control boxes and multi-protocol gateways, with standalone OTA upgrades after handover
Inline inspectionYOLO vision and edge algorithms, sited at the stages where a defect can still be removed
Quotation turnaroundConfiguration and quotation returned in one business day
AcceptanceSigned off against a written acceptance plan at step 6 of the 6-step project sequence

The number most quotations are compared on is the wrong one

Extruder throughput is what nearly every quotation leads with, and it's the number least likely to decide what your line actually clears. A high extruder rating in front of an undersized dryer produces a bottleneck, not output, and the dryer is where the money then leaks away every shift.

The extruder sets the ceiling on paper; the dryer sets it in practice.
Average moisture is the number that gets quoted; the spread across the bed is the number that costs you.

A wide spread forces the whole batch to be dried lower than it needs to be. That second number is finished weight you made and then evaporated, and it's invisible without measurement. Which is why the inspection layer is priced into our lines instead of sold as an upgrade.

Request a Line Configuration

Check your own scope before you talk to anyone

The Dry Kibble Scope Readiness Score walks through the decisions a kibble line needs before a quotation means anything: format, output, packaging and control scope. It runs in the browser with no form and no email gate.

There's no price list for a configured line, and any figure quoted before the format and output are fixed is a placeholder. Price follows six variables, and every one of them is something you already know or can decide. Customization depth moves the figure more than any single machine choice does.

#VariableWhat moves itYour answer
1Production routeDry kibble, freeze-dried, wet canning or jerky — the route sets the machine families
2Output bandThe output you are building for, not the output you hope for in year three
3Automation levelHow much manual handling stays between stages
4Integration scopeSingle machine, complete line, or plant-level planning
5Packaging formatBag, can, pouch or premade bag, and the barrier it needs
6Control and data scopeWhether control terminals, gateways and OTA upgrades are in scope

Copy those six rows into your enquiry and you'll get a comparable answer from any supplier, not only from us. That's the point of publishing them.

Comparing two quotations that do not cover the same scope

Assume nothing about scope parity between quotations until the boundary map is written down, because a scope mismatch is what turns a cheaper number into a more expensive project. The trade-off is straightforward: a lower equipment figure usually means more integration work left on your side, and that work costs you at commissioning rather than at purchase.

  • A bigger extruder buys you nothing if the dryer behind it can't follow.
  • Shengtu quotes against the boundary map rather than against a machine list, so the comparison is like for like.
  • Ask every supplier which of the six variables their figure assumes, and the mistake most first quotations invite disappears.

How your quotation is produced

  • You send the product format and the output you're planning for.
  • A process engineer maps it onto one of the four routes and marks where a second route has to join.
  • The configuration and quotation come back in one business day, with the scope boundary written out.

Schedule is locked at design confirmation rather than at enquiry, because the long-lead items in a line are decided by the layout, not by the order date. We don't quote a delivery week before the layout is signed, and we would treat any supplier who does with some caution.

Score the six variables before you ask anyone for a figure

The Six-Variable Quotation Score walks through the six variables above and tells you how much of a real quotation you can already support. It also writes the enquiry summary for you, so every supplier you approach is answering the same brief.

Pet Food Formats the Lines Are Configured For

Format decides route. Before capacity, before automation level, before budget, the question that shapes every downstream decision is what the finished piece looks like when it leaves the packer. Eight formats sit below, and each one maps onto a route above.

  • A dry pet food production line and a wet pet food production line almost never share a defining stage, whatever the recipe says
  • A dog food production line and a cat food production line in the same format usually differ only at the die and the pack size
  • Biscuit, kibble and premium pet food inclusions differ in the shaping and drying stages, not in the mixer
  • Canned pet food is the only one of the eight whose safety case is written before the layout is
Dry kibble format

Dry kibble

Process character Cooked and expanded under heat and pressure, then dried and coated
Defining stage Twin-screw extrusion
Automation level Continuous, from dosing through to bagging
Route Dry kibble extrusion line Dry Kibble Extrusion Line
Semi-moist pieces format

Semi-moist pieces

Process character Higher finished moisture than kibble, so drying is shortened and packaging does more of the shelf-life work
Defining stage Controlled drying with a moisture hold
Automation level Continuous, with tighter dryer control
Route Dry kibble extrusion line, reconfigured Dry Kibble Extrusion Line
Freeze-dried blocks and nuggets format

Freeze-dried blocks and nuggets

Process character Frozen, then dried under vacuum so structure survives instead of collapsing
Defining stage Vacuum freeze-drying
Automation level Batch, paced by the dryer cycle
Route Freeze-dried pet treat line Freeze-Dried Pet Treat Line
Freeze-dried raw toppers format

Freeze-dried raw toppers

Process character Single-ingredient protein pieces, dried without a cooking step
Defining stage Dicing consistency ahead of the freeze dryer
Automation level Batch, with metal detection before packing
Route Freeze-dried pet treat line Freeze-Dried Pet Treat Line
Wet chunk in gravy format

Wet chunk in gravy

Process character Diced solids and sauce filled together, then sterilised in the sealed pack
Defining stage Retort sterilizing
Automation level Batch sterilising between continuous filling and labelling
Route Wet pet food canning line Wet Pet Food Canning Line
Wet pâté and loaf format

Wet pâté and loaf

Process character Emulsified before filling, so the filler and the seamer set the pace
Defining stage Filling and seaming under a controlled headspace
Automation level Continuous filling into a batch retort
Route Wet pet food canning line Wet Pet Food Canning Line
Jerky strips and twists format

Jerky strips and twists

Process character Cut, marinated and dried rather than cooked and expanded
Defining stage Marinating
Automation level Batch marinating into continuous drying
Route Pet jerky drying line Pet Jerky Drying Line

Inline Inspection, Data Capture and Traceability

Food safety on a line is designed in at the stages where a hazard can still be removed, and then proved by what the line recorded. Both halves matter: a control that nobody can evidence is indistinguishable from a control that never ran, and that gap is where a recall risk actually sits.
Shengtu builds the inspection and data layer into the line for a structural reason, not a commercial one. Recording a parameter after the fact costs more than measuring it in place, because the evidence then has to be reconstructed from people rather than read off the machine.

Four technical modules

Inline vision inspection

Inline vision inspection

YOLO vision and edge algorithms run at the line rather than in a back-office server, so a reject decision happens while the piece is still on the belt. Placement matters more than resolution: inspection after the pack is closed only tells you what to throw away.

Data capture

Data capture

Low-code control boxes and multi-protocol gateways bring machines from different builders into one data set. That's the practical problem on a real line, where the extruder, the dryer and the packer rarely speak the same protocol, and where each arrives with its own control systems already installed.

Traceability

Traceability

Batch data is carried through the line so a finished pack can be tied back to the raw material intake and to the process conditions it was made under. For a sealed low-acid pack, 21 CFR 113.100 sets out what has to be on the record: initial temperature, actual processing time and the readings from both the indicating and the recording device.

Engineering base

Engineering base

The STUnit platform is the reason equipment ships with control capability already present rather than retrofitted. Behind it sit 100+ R&D projects, 100+ software copyrights and 7 patents.

Regulatory demands the equipment itself has to meet

“Each retort … shall be equipped with at least one temperature-indicating device that indicates the temperature. … Each temperature-indicating device shall be tested for accuracy against a known accurate standard thermometer … and shall be accurate to 1 °F (0.5 °C).”
21 CFR 113.40(a)(1)(iv), Thermally Processed Low-Acid Foods Packaged in Hermetically Sealed Containers

That single clause is why a controls-and-records upgrade is so often enough. It asks for an instrument and a traceable calibration, not for a new vessel.

Requirement Where it comes from What it means when you specify a line
A written hazard analysis for the animal food you make, whatever its outcome 21 CFR 507.33 The line has to make the hazards controllable and measurable, not merely present
Process controls with a stated maximum or minimum value for the parameter being controlled 21 CFR 507.34 Set points have to be settable and readable on the line, not held in someone's notebook
A scheduled process established by a qualified person, at least equivalent to one set by a competent processing authority 21 CFR 113.3 and 113.83 The retort must be able to run and hold what the filed process says
A temperature-indicating device and a separate recording device on each retort 21 CFR 113.40 Two instruments, one of which writes a permanent record

Standalone OTA upgrades mean the software side of this can move after handover without a mechanical shutdown. That matters most in the second and third year, when the requirement changes and the line doesn't.

Build the record set for your own route

The United States Record Set Builder takes your route and destination and lists the instruments, records and documents that belong in the specification, each against the clause it comes from. It also shows which routes the sealed low-acid rules don't touch at all.

Open the Record Set Builder

The Six Steps From Enquiry to Line Acceptance

Process Step 1
Process Step 2
Process Step 3
Process Step 4
Process Step 5
Process Step 6
Process Step 7
Process Step 8
Process Step 9
Process Step 10

Format and output confirmation

you describe the finished piece and the output you're building for

Route selection

we map it onto one of the four routes and flag where a second route has to join

Configuration and quotation

returned in one business day, with the scope boundary written out

Layout and design confirmation

the drawing is agreed before anything long-lead is ordered

Manufacture and in-works testing

the equipment is run before it ships, and integration responsibility stays with us rather than moving to you

Installation, commissioning and acceptance

closed out against a written acceptance plan

The question that costs first-time builders the most money isn't what a machine costs. It's who's responsible for the gap between two machines. This map states it per stage, for every route.

StageWho suppliesWho installsWho commissionsWho signs at acceptance
Intake, dosing and mixingShengtuShengtu with your site teamShengtuBoth parties
Size reduction and conditioningShengtuShengtu with your site teamShengtuBoth parties
Defining process stageShengtuShengtuShengtuBoth parties
Drying, cooling or sterilisingShengtuShengtuShengtuBoth parties
Inspection and data captureShengtuShengtuShengtuBoth parties
Packaging and labellingShengtuShengtuShengtuBoth parties
Utilities to the connection pointYour siteYour siteJoint checkBoth parties
Building, drainage and hygienic zoningYour siteYour siteJoint checkBoth parties
Filed thermal process for a low-acid productYour processing authorityNot applicableVerified against the retortBoth parties
DecisionWhat to specifyWhy it saves money
Dryer capacitySize the dryer and coater against the extruder rating with headroom, not to match itThe dryer, not the extruder, is what caps a kibble line's real output
Moisture measurementMeasure the spread across the bed, not just the averageA wide spread forces over-drying, and over-drying is sellable weight evaporated
Wet and dry zoningSeparate the steam-heavy side from the labelling and packing side at layout stageRetrofitting a barrier after the line runs costs more than drawing it in once
Retort sizingChoose the retort size against your smallest realistic batch, not your largestAn oversized retort runs part-loaded, and part-loaded batches are the ones that go wrong
Format rangeFix the format range before the layout, and state the second format if there is oneAdding a format after layout usually means moving equipment, not adding it
ChangeoverSpecify the changeover you expect per shift at enquiryChangeover frequency changes the packer and the conveying design, and it is cheap to design in
Control scopeDecide whether gateways and terminals are in scope before the quotationAdding the data layer later means opening panels that were already signed off
Metal detection positionPlace detection where a reject can still be removed from the flowDetection after sealing converts a rework into a write-off
Spare partsAgree the wear-part list at acceptance, not at first failureThe parts that stop a line are cheap; the downtime waiting for them is not
Sampling and releaseFix where the final product is sampled and who releases itProduct quality disputes are settled by the sampling point, not by the argument afterwards

What happens after acceptance

Service continuity is the question buyers ask last and regret asking last. Three things are settled at acceptance rather than at the first stoppage.

Wear-part list:

agreed and handed over at acceptance, split into what's held on your site and what's made to order

Software:

standalone OTA upgrades move the control side forward without a mechanical shutdown, so a requirement change in year two doesn't become a rebuild

Records:

the per-batch record set the line produces stays available to you, which is what an auditor asks for and what a recall enquiry depends on

Scope:

anything outside the boundary map above is named at acceptance, so nobody discovers an unowned gap during a stoppage

Walk the boundary stage by stage

The Stage-by-Stage Scope Split takes the map above one stage at a time: who supplies, who installs, who commissions, who signs, and the single design decision at that stage that moves the figure. Use it to compare two quotations on boundary before you compare them on price.

Open the Stage-by-Stage Scope Split

Line and Equipment Gallery

Four production-line image sets cover the machine sequence for each route, from intake through to the packer. Each set is labelled with the route it belongs to and the stage it shows, so a drawing can be matched against the configuration matrix above.

Target Profile 01

Pet food brands moving in house

Brands that have outgrown a co-manufacturer usually arrive with a format and a volume and no layout. Our first three steps exist for exactly that starting point.

Pet owners now read labels for named proteins, freeze-dried inclusions and single-ingredient treats, and that's what pushes a brand off a shared line.

Formulation control is usually the reason for the move; capacity is usually the justification.

Target Profile 02

Contract manufacturers

Co-manufacturers buy for changeover flexibility rather than peak output, because the number of formats per shift is what decides their margin. Customization here means the ability to diversify the food products a single line can carry, not a bespoke machine. That changes the packer and the conveying design more than it changes the extruder.

Target Profile 03

Feed producers adding a pet category

A feed extruder and a pet food extruder share a working principle but not a specification, and the drying and coating stages diverge sharply. Animal feed pellets tolerate a wider finished-moisture band than pet food products do, which is the assumption that catches most crossovers out. Aquatic feed is a further step away again, since sinking and floating fish feed requirements change the die and the dryer.

Target Profile 04

Cross-border own-brand operators

If the destination market is the United States, the record set the line has to produce is defined before the line is designed. That's a specification input, not a compliance task for later.

Freeze dried pet food and canned formats carry different documentation loads into the same destination market.

Where the pet food industry sells on brand, the border sells on records.

Not ready to send a specification yet

Score your own scope in the browser first, no form, no email, no follow-up call. It takes a couple of minutes and tells you which of the six variables you can already answer.

Score your scope readiness

Four situations where buying a complete line is the wrong answer, and what to do instead in each. A pet food processing plant isn't interchangeable with a feed mill, and a pilot batch isn't a substitute for a line trial.

Freeze-drying as your main volume route

Why it works against you

The cycle is long and energy-hungry per kilo, so it scales by adding chambers rather than by running faster.

What to do instead

Use extrusion for the volume product and freeze-drying for the topper or treat, and size the freeze dryer against that split.

Chasing continuous high output on a wet canning line

Why it works against you

Retorting is a batch operation, so line balance has to be recalculated around the batch rhythm rather than a nameplate rate.

What to do instead

Match retort size and count to the filler rate first, then decide the fill speed.

One line covering formats that are far apart

Why it works against you

Every format you add after the layout is fixed tends to move equipment rather than add it.

What to do instead

Phase the build: commission the first format, then extend against a layout that already reserved the space.

Very small development or sampling volumes

Why it works against you

A production line is the most expensive way to answer a recipe question.

What to do instead

Prove the formulation and the process at pilot scale first, then bring the confirmed parameters into the line specification.

Only the second row has a regulatory floor under it

A sealed low-acid pack runs to a scheduled thermal process, and 21 CFR Part 113 sets what the retort has to hold and record for each batch. That's why the batch rhythm is a design constraint on a wet line rather than a tuning question, and why matching retort size and count to the filler rate comes before any decision about fill speed.

Frequently Asked Questions