Shengtu buyer worksheet

Existing-Equipment Interface Check

Reuse can save hardware and still add survey, retrofit, controls and responsibility work. Fill this in once per machine you intend to keep. What decides feasibility is not the machine’s age but whether the product state, mechanical interface, controls and utilities line up with the stage next to it.

Machine identity

Product interface

Mechanical and layout interface

Controls and utilities

Hygiene and responsibility

0 of 16 interface points captured

Notes for the survey

A reuse decision is only final after the interface, controls and responsibility boundary are written into the proposal.

Send the interface check to Shengtu