Get in touch with Shengtu Bufan Company
Cutting Line Readiness Checklist
Six things a supplier needs before a cutting line quotation means anything. Tick what you already have. Nothing is sent anywhere — the scoring runs in your browser.
What you should have ready
A dimensioned sketch beats a description. Columns decide where a line can turn.
weight 3
The rate carcasses actually arrive, not the slaughter line nameplate.
weight 3
Primal list, bone-in or boneless, skin-on or skinless, chilled or frozen.
weight 2
Decides the document pack scope and the electrical build.
weight 2
Phasing a room station by station needs the calendar first.
weight 1
Own crew, contractor, or supplier support — settle it before commissioning.
weight 1
0%
Still missing:
Send what you have and we will tell you what is still needed. A partial list is still worth sending — we quote the gaps as assumptions and state them in writing.

![Dry Kibble Extrusion Line: Process Control Guide [2026]](https://shengtumachinery.com/wp-content/uploads/2026/08/dry-kibble-extrusion-line-guide-featured-150x150.png)