Capacity is quoted in kilograms of infeed per hour, but you buy against finished packs per day. This estimator converts your daily plan into the infeed rate a leafy fresh-cut line has to hold, then shows which of the three standard tiers absorbs it.
Your production plan
Exclude start-up, wash-down and the sanitation window.
Each changeover costs line time you still have to make up.
The packing station sets the pace the wash line has to match.
Infeed has to be larger than output by exactly this margin.
Enter your plan on the left. The estimate returns the required infeed rate, the tier that carries it, how much headroom is left in that tier, and the figures a supplier still has to confirm in writing before the rate means anything.
Required infeed rate
0kg/h
Tier 10% loaded
Tier 20% loaded
Tier 30% loaded
Ask every supplier to state these in writing, against your crop:
Rated infeed rate in kg/h, named against the crop it was measured on
Installed electrical load in kW and water consumption per hour at that rate
Floor footprint and minimum ceiling height for the complete line
Changeover time between two named crops, measured, not estimated
Sanitation time to return the line to a clean start
A rate quoted without the crop it was measured on is not a specification.
Method: infeed rate = daily finished weight ÷ yield factor ÷ productive hours, multiplied by a changeover factor and a pack-format factor. Those two factors are planning allowances published on this page so you can audit the arithmetic; they are not performance data measured on any specific machine. Treat the output as a shortlist filter, not a quotation.