Extrusion-Line Supply Boundary Matrix
Assign a proposed owner to each work package. Every choice remains provisional until it appears in the written quotation and acceptance documents.
| Work package | Boundary question | Proposed owner |
|---|---|---|
| Raw-material preparation | Grinding, sieving, batching and ingredient release | |
| Dosing and preconditioning | Feed accuracy, liquid addition and upstream controls | |
| Extrusion core | Feeding interface, barrel/screw package, die interface and local controls | |
| Die and cutting | Product geometry, cutter interface and change parts | |
| Drying and cooling | Moisture removal, cooling target and capacity match | |
| Conveying and packaging | Transfers, buffers, metal detection, weighing and packing | |
| Site utilities | Power, water, steam, air, drains, ventilation and supports | |
| Plant controls and data | Signals, protocols, historian/MES, remote access and cybersecurity | |
| Installation and commissioning | Rigging, alignment, connections, dry checks and wet trials | |
| FAT, SAT and acceptance | Test recipe, sampling, limits, witnesses and deviation closure | |
| Cleaning and hazardous energy | Cleaning method, allergen changeover, isolation points and site LOTO | |
| Training, spares and service | Operator training, spare-parts list, remote support and escalation |
Choose proposed owners, then build the summary.
The matrix is a scoping aid, not a contract. Ownership changes only when both sides confirm it in writing.

![Dry Kibble Extrusion Line: Process Control Guide [2026]](https://shengtumachinery.com/wp-content/uploads/2026/08/dry-kibble-extrusion-line-guide-featured-150x150.png)