Extrusion-Line Supply Boundary Matrix

Assign a proposed owner to each work package. Every choice remains provisional until it appears in the written quotation and acceptance documents.

Work packageBoundary questionProposed owner
Raw-material preparationGrinding, sieving, batching and ingredient release
Dosing and preconditioningFeed accuracy, liquid addition and upstream controls
Extrusion coreFeeding interface, barrel/screw package, die interface and local controls
Die and cuttingProduct geometry, cutter interface and change parts
Drying and coolingMoisture removal, cooling target and capacity match
Conveying and packagingTransfers, buffers, metal detection, weighing and packing
Site utilitiesPower, water, steam, air, drains, ventilation and supports
Plant controls and dataSignals, protocols, historian/MES, remote access and cybersecurity
Installation and commissioningRigging, alignment, connections, dry checks and wet trials
FAT, SAT and acceptanceTest recipe, sampling, limits, witnesses and deviation closure
Cleaning and hazardous energyCleaning method, allergen changeover, isolation points and site LOTO
Training, spares and serviceOperator training, spare-parts list, remote support and escalation
Discuss the Project Scope
Choose proposed owners, then build the summary.

The matrix is a scoping aid, not a contract. Ownership changes only when both sides confirm it in writing.