Get in touch with Shengtu Bufan Company
RFQ Readiness Scorecard
Tick only fields backed by a written value, drawing, sample, plant record, or approved decision. The score measures input completeness; it does not predict quotation outcome.
Product and process
Plant and safety
Pack, controls, and handover
Run the scorecard to create a follow-up list. Unknowns stay visible instead of being filled with default assumptions.
Completion percentage is based only on the 12 fields above. It does not rate a supplier, machine, product, or investment.

![Dry Kibble Extrusion Line: Process Control Guide [2026]](https://shengtumachinery.com/wp-content/uploads/2026/08/dry-kibble-extrusion-line-guide-featured-150x150.png)